Restricted Access Is A Planning Problem, Not A Reason To Say No.
A courtyard this narrow rules out trolleys, spa skates and manpower. The only realistic route was over the top - which means the lift has to be right first time, with the base, the levels and the power connection already finished and waiting.
Part of the existing steps was demolished to open the footprint, a reinforced concrete slab was poured for the filled weight of the spa, and a dedicated supply cable was run to the technical bay before the crane truck was ever booked.
The result is a spa that looks like it was always part of the courtyard, with the service side left clear so filters, pump and control box stay reachable.
Coordinating demolition, groundwork, electrics, crane scheduling and precise placement takes more than technical know-how - it takes real project management. That experience comes from years of construction project management on Mallorca, which is what allows us to run complex installations cleanly, on schedule and without surprises.